SR 520 Portage Bay Bridge Replacement Navigation Impact Assessment

Photo courtesy of WSDOT

  • Client:
    HDR Engineering, Inc
  • Completion Date:
    December 2022
  • Key Collaborators:
    Confluence Environmental
    US Coast Guard
  • Project Type:
    Marine Infrastructure
  • Service Categories:
    Ocean Engineering
    Marine Consulting
  • Challenge:
    Navigation impact assessment for the SR 520 Portage Bay Bridge.

WATERWAY INFRASTRUCTURE CHANGES.

The Washington State Department of Transportation (WSDOT) is working to replace the State Route 520 bridges in the Seattle area with seismically resilient structures that offer safety and transportation improvements. The construction and replacement of the 1960s-era Portage Bay Bridge had the potential to modify navigational clearances for vessels transiting the area, so WSDOT needed to apply for a new US Coast Guard (USCG) bridge permit. In 2020, Glosten was contracted to prepare the navigation impact report for the permit application, which would assess the planned changes to the bridge in light of navigational clearance requirements based on past, existing, and potential future waterway users.

Portage Bay 3

PROVIDING SUBJECT MATTER EXPERTISE.

Glosten investigated the impacts to vessel traffic that would be caused both by the temporary bridge that will service construction vehicles and equipment during the six-year construction period, and by the newly modified Portage Bay Bridge. Our evaluation relied on data gathered from more than a dozen emergency, commercial, and recreational vessel users and took into account site-specific factors such as the proximity and activities of two local yacht clubs. The study found that the temporary and proposed bridges would meet the requirements for safe navigation of anticipated emergency traffic, all current commercial traffic, and some recreational vessel traffic. Some berthing at the smaller of the two yacht clubs, located close to the planned modified bridge piers, would be impacted.

Our report followed a USCG-recommended outline and was submitted to USCG in June 2022. The report addressed comments provided by both WSDOT and USCG; USCG issued a Preliminary Navigation Clearance Determination in August of that year.