Earthquake-Ready Burnside Bridge

  • Client:
    HDR Engineering, Inc
  • Project Type:
    Marine Infrastructure
  • Service Categories:
    Ocean Engineering
    Marine Consulting
  • Challenge:
    Predict navigability requirements for bridge planning and design.

A CRITICAL LIFELINE.

Like much of the Pacific Northwest, Oregon is vulnerable to major earthquakes. The aging Burnside Bridge, which spans the Willamette River in downtown Portland, is a key component of a regional “lifeline route” that would maintain access to services during an emergency. Multnomah County is planning a replacement for the bridge that will be able to withstand and be usable immediately after a major earthquake.

When a bridge across a navigable waterway is built or modified, project proponents must obtain a bridge permit from the US Coast Guard (USCG). The permit application requires a navigation impact study to prove to the USCG that adequate space will be provided for all vessel traffic likely to use the waterway, including all future vessels over the bridge’s entire lifespan. Establishing the bridge’s clearance needs in an evidence-based, technically defensible manner during the preliminary design phase minimizes the risk of needing costly design rework later on.

DSCF2312

FIRST THINGS FIRST.

HDR Engineering hired Glosten to perform the navigation impact study for vessels transiting under the Burnside Bridge. Using our decades of maritime transportation consulting experience, we gathered and synthesized waterway data in a comprehensive, efficient, and technically accurate manner that facilitated the permit process with the USCG and would ensure the safe passage of all vessels.

With the data from the navigation impact assessment, Glosten also conducted an allision analysis that followed the method prescribed by the American Association of State Highway and Transportation Officials. This analysis calculated the annual frequency of collapse due to vessel impacts for the Burnside Bridge and a recommended horizontal resistance value for the main piers of the new bridge to withstand an allision.

Glosten continues to support the Burnside Bridge project with navigation support during the final design phase.