Abernethy Bridge Modification Navigation Impact Assessment

  • Client:
    HDR Engineering, Inc
  • Completion Date:
    June 2019
  • Project Type:
    Marine Infrastructure
  • Service Categories:
    Ocean Engineering
    Marine Consulting
  • Challenge:
    Synthesize data, operational experience, and forecasting to predict bridge navigability requirements.

IMPROVING A COMMUNITY CONNECTION.

The Oregon Department of Transportation is making improvements to the Abernethy Bridge, which carries Interstate 205 over the Willamette River and connects Oregon City and West Linn. Modifying a bridge over a navigable waterway requires a permit from the US Coast Guard and an assessment of any impacts to navigation during construction and over the lifespan of the updated bridge. In 2018, Glosten was contracted by HDR Engineering to conduct a navigation assessment of a temporary bridge that would be used during construction as well as the final modified bridge. Our engineers also performed an allision loads analysis to determine the level of impact the bridge structure could sustain.

DSCF2312

REAL-WORLD DATA FOR SAFETY IN DESIGN.

For the navigation assessment, Glosten examined the conditions of the Willamette River and usage upstream and downstream of the Abernethy Bridge. Because this work occurred at the same time as our navigation impact assessment for the Burnside Bridge located just 12 miles down the river, we were able to share the data between projects and more efficiently assess the aspects of the river the USCG needed to review for their permit determination.

Due to the remote nature of the bridge and limited vessel traffic, we determined that the American Association of State Highway and Transportation Officials annual frequency of collapse method would have yielded unreliable results that could have resulted in inadequate protection. We developed a basis for and carried out an alternative allision loads analysis so that our client could ensure the safety of construction equipment, crews, and the bridge throughout its lifespan.

Construction on the Abernathy Bridge is expected to conclude in 2025 and Glosten continues to support the project through a contract with Kiewit.