A VITAL LINK.
After an inspection revealed significant deterioration of the 80-year-old support piers, the New York State Department of Transportation suddenly closed the old Lake Champlain Bridge. The bridge connected Crown Point, NY to Chimney Point, VT, and its closure had a huge impact on the local community, separating residents from important services and forcing thousands to add 85 miles to their daily commute. A replacement was needed fast.
As part of their expedited construction strategy, the project team decided to fabricate the center bridge archway span off site while the bridge approach spans were being built in situ. The center span was then to be floated in and lifted into place. Flatiron contracted Glosten to provide engineering to support the archway span’s loading and transport to the bridge site and to provide onsite construction support.