OFF THE BEATEN PATH.
When the Alaska Marine Highway System (AMHS) awarded the Alaska-class ferry construction project to Vigor’s Ketchikan shipyard in 2014, it marked the first time AMHS ferries would be built in Alaska. Vigor engaged Glosten to provide a detailed production model for the M/V Tazlina based on the contract design, and our production engineers worked closely with Vigor’s team to develop production deliverables in the proper sequence to support their build strategy. The relatively remote location of the shipyard meant that something as small as a missing nut or bolt could have had a big impact on the build sequence and schedule. Careful planning and close communication were critical to preventing supply chain delays.