Port of Portland Dredge Oregon: Stern Redesign

  • Client:
    Port of Portland
  • Completion Date:
    May 2021
  • Project Type:
    Vessel Design & Modification, Special Purpose Vessels
  • Service Categories:
    Naval Architecture
    Owner Services & Onsite Support
  • Vessel Overview:
    Cutter suction dredge for maintaining the Columbia River navigation channel
  • Challenge:
    Replace and upgrade a complex stern on a hardworking vintage vessel.

STERN REDESIGN.

The Port of Portland Navigation Division’s cutter suction dredge (CSD) Oregon was built in 1943 as a river towboat and was converted to work as a dredge for the Port in 1965. In 2016, the Port requested Glosten’s assistance to evaluate the vessel’s structure and address steel fatigue and cracking in the hull and around the spud wells at the Oregon’s stern. Glosten determined that, owing to the shallow depth of the stern from its towboat days, the reactions from the spuds were very large. Our finite element analysis (FEA) confirmed the steel around the spuds had reached its service life and that the supporting steel in the stern needed to be replaced. Based on information from the vessel’s historical records and laser scanning data from its hull, we designed a new stern section which reduced the spud reactions and efficiently transmitted the force to the rest of the hull.

Dredge_009

PORT INVESTMENT IMPROVES VESSEL PERFORMANCE.

The stern redesign project also allowed the Port the opportunity to improve crew safety when raising and lower the spuds. Glosten and the Port examined options for a new spud system and evaluated the operational efficiency gains offered by each and selected Royal IHC’s system for its simplicity, ease of use, and IHC’s extensive dredge experience. Glosten worked side by side with IHC to incorporate the new spud hoisting system into our new hull.

The Oregon’s stern replacement was completed in 2021. Glosten continued to provide support, including on-site review and engineering support for emergent work items, from construction through commissioning. Thanks to the redesign investment made by the Port, the Oregon’s operations are safer and more efficient.