Our depth and breadth of experience has resulted in a body of work we’re proud to showcase. From one-of-a-kind projects to solid fundamentals, we’re confident you’ll find that our commitment to excellence shines through in everything that we do. Explore our case studies, and see what Glosten can do for you.

Local Terminal Proposed

,

Glosten was tasked with performing a vessel traffic and risk analysis of the proposed terminal, to provide an unbiased report on a topic with opposing viewpoints.

Read More

High Capacity Derrick Barge Required

,

Manson Construction Company of Seattle hired Glosten to build a new, high capacity derrick barge for marine construction service.

Read More

I-35 Bridge: Responding to Tragedy

On August 1 2007, the I-35 bridge collapsed in the middle of rush hour. Glosten was contracted to design the bridge segment lift sequence and grillage, and the...

Read More

Arctic Tow Mission

, ,

Glosten was contracted by Exxon Neftegas Limited for overall management of moving the ORLAN, a 325 feet square Concrete Island Drilling Structure (CIDS), from Prudhoe Bay, Alaska, to Sovietskaya...

Read More

In a League of its Own: the Semi-Submersible SBX-1

, ,

Glosten worked as the project engineering integrator and designer for all marine aspects of this $900 million project.

Read More

Long Core Installed on the R/V Knorr

,

Recovering long sediment gravity cores from the seabed was a hallmark of marine geology research in the 1970s but was abandoned by the U.S. oceanographic community by the mid-1980s....

Read More

LNG: The Fuel of the Future?

, ,

Vessel owners and operators are concerned with the cost of increasingly restrictive air emission requirements. The use of LNG fuel instead of diesel or gasoline is gaining popularity due...

Read More

A New Research Vessel for Xiamen University

,

Xiamen University (XMU) is building an oceanographic research ship that is intended to be a floating laboratory on the sea. The vessel will be 78 meters in length with...

Read More