Projects

Our depth and breadth of experience has resulted in a body of work we’re proud to showcase. From one-of-a-kind projects to solid fundamentals, we’re confident you’ll find that our commitment to excellence shines through in everything that we do. Explore our case studies, and see what Glosten can do for you.

PelaStar Rendering

PelaStar Tension Leg Platform for Floating Offshore Wind

, , ,

The PelaStar system was conceived by Glosten engineers in 2006, who saw a need to reduce the capital costs of offshore wind and access sites with superior wind resources.

Read More

Panama Canal Expansion Consulting

,

The Panama Canal Third Set of Locks will double the Canal’s capacity by creating a new third lane of traffic and allowing more and larger ships to transit.

Read More

Foss Arctic Class Tugs

Foss Maritime built three arctic class tugboats at its Rainier Shipyard to serve the oil and gas industries in Alaska. Foss engaged Glosten to execute this new design from...

Read More

I-35 Bridge: Responding to Tragedy

On August 1 2007, the I-35 bridge collapsed in the middle of rush hour. Glosten was contracted to design the bridge segment lift sequence and grillage, and the...

Read More

Arctic Tow Mission

, ,

Glosten was contracted by Exxon Neftegas Limited for overall management of moving the ORLAN, a 325 feet square Concrete Island Drilling Structure (CIDS), from Prudhoe Bay, Alaska, to Sovietskaya...

Read More

SBX Mooring System Design

Glosten provided engineering services and owner’s representation to The Boeing Company for the installation of a permanent eight-point MODU style mooring for the semi-submersible SBX-1 at Adak, Alaska. The...

Read More