Projects

Our depth and breadth of experience has resulted in a body of work we’re proud to showcase. From one-of-a-kind projects to solid fundamentals, we’re confident you’ll find that our commitment to excellence shines through in everything that we do. Explore our case studies, and see what Glosten can do for you.

A New Ferry for Governors Island

Glosten led The Trust for Governors Island through a complete vessel acquisition study after they identified a need to acquire a new ferry. Follow along here to view...

Read More

Ballast Module Retrofit Program

, ,

Glosten was tasked with developing a ballast module retrofit design and integration program for a major tank barge operator. Upon determining the most practical integration solution, Glosten provided...

Read More

Bulk Carrier Ballast Water Treatment System Retrofit

, ,

The Sheila Ann, a Panamax bulk carrier owned by CSL, was scheduled for drydocking in December of 2014. CSL tasked Glosten with determining the feasibility of retrofitting the...

Read More

A Shipboard and Land-Based Ballast Water Treatment Testing Facility

, ,

Glosten served as the technical consultant for the engineering and design of the Golden Bear Facility, and helped develop the facility’s standard procedures and quality control practices.

Read More

Longest Floating Bridges in the World

, ,

WSDOT commissioned Glosten in 1983 to evaluate the wind and wave forces for the new I-90 bridge design and the two existing Lake Washington bridges.

Read More

Olmsted Dam to Revitalize Ohio River Commerce

,

Glosten worked closely with Washington Group / Alberici to design three unique barges to support the "in the wet" construction of the Olmsted Locks and Dam project.

Read More

Beloved Research Vessel Approaches Mid-Life Overhaul

Glosten is supporting the mid-life overhaul of the 25-year old research vessel of the University of Washington, R/V Thomas G. Thompson.

Read More

Offshore Wind – Front End Engineering Design Study

, ,

In 2012, the UK's Energy Technologies Institute (ETI) awarded Glosten funding to perform a FEED study for a full-scale 6MW offshore wind floating platform system demonstrator.