Bulk Carrier Ballast Water Treatment System Retrofit
The Sheila Ann, a Panamax bulk carrier owned by CSL, was scheduled for drydocking in December of 2014. CSL tasked Glosten with determining the feasibility of retrofitting the...
Read More
Beloved Research Vessel Approaches Mid-Life Overhaul
Glosten is supporting the mid-life overhaul of the 25-year old research vessel of the University of Washington, R/V Thomas G. Thompson.
Read More
Coeur d’Alene Resort Floating Golf Green
One of Glosten's most unique projects is its support of Dix Corporation in the design of the renowned floating 14th hole at the Coeur d’Alene Resort.
Read More
PelaStar Tension Leg Platform for Floating Offshore Wind
The PelaStar system was conceived by Glosten engineers in 2006, who saw a need to reduce the capital costs of offshore wind and access sites with superior wind resources.
Read More
Sikuliaq Readies for Ocean Research in Arctic
Glosten designed the R/V Sikuliaq to accommodate up to 26 scientists and students to conduct a myriad of cross-disciplinary studies in the Alaska region, year-round.
Read More
Oregon State University Leads Research Vessel Acquisition
The National Science Foundation (NSF) selected Oregon State University (OSU) to lead the design and acquisition for the new Regional Class Research Vessels (RCRVs). OSU enlisted Glosten to develop...
Read More
Excavator Dredge Design
J.E. McAmis, a marine construction firm used to working in tough conditions, needed a hydraulic excavator to add to their dredging capability, enabling accurate digging in firm bottom conditions...
Read More
JOIDES Resolution Drill Ship Refit
Transocean contracted Glosten in 2006 to develop the contract design package for an extensive refit of the JOIDES Resolution.
Read More