
Bulk Carrier Ballast Water Treatment System Retrofit
The Sheila Ann, a Panamax bulk carrier owned by CSL, was scheduled for drydocking in December of 2014. CSL tasked Glosten with determining the feasibility of retrofitting the...
Read More
Global Class Research Vessel Gets a Mid-Life Overhaul
Glosten is supporting the mid-life overhaul of the 25-year old research vessel of the University of Washington, R/V Thomas G. Thompson.
Read More
Keeping Marine Research Thriving
Glosten performed stability evaluations on 16 vessels of the University-National Oceanographic Laboratory System (UNOLS) fleet.
Read More
New Requirements for Research Vessels Everywhere
Glosten supported UNOLS in developing a standardized methodology to provide Maximum Capability Documents for every component of every UNOLS vessel.
Read More
Exxon Kizomba – Traversing Oceans
Spanning 10,000 miles over six months, the Glosten-developed tow plan for the Kizomba A brought the vessel from Korea to offshore Angola via the Cape of Good Hope.
Read More
JOIDES Resolution Drill Ship Refit
Transocean contracted Glosten in 2006 to develop the contract design package for an extensive refit of the JOIDES Resolution.
Read More
SBX Mooring System Design
Glosten provided engineering services and owner’s representation to The Boeing Company for the installation of a permanent eight-point MODU style mooring for the semi-submersible SBX-1 at Adak, Alaska. The...
Read More