Making Way for a New Bay Bridge
Glosten assisted California Engineering Contractors with the marine aspects of demolishing the SF-Oakland Bay Bridge, reversing the construction process by disassembling the bridge in chunks and lowering the spans...
Read More
Longest Floating Bridges in the World
WSDOT commissioned Glosten in 1983 to evaluate the wind and wave forces for the new I-90 bridge design and the two existing Lake Washington bridges.
Read More
Olmsted Dam to Revitalize Ohio River Commerce
Glosten worked closely with Washington Group / Alberici to design three unique barges to support the "in the wet" construction of the Olmsted Locks and Dam project.
Read More
Beloved Research Vessel Approaches Mid-Life Overhaul
Glosten is supporting the mid-life overhaul of the 25-year old research vessel of the University of Washington, R/V Thomas G. Thompson.
Read More
Offshore Wind – Front End Engineering Design Study
In 2012, the UK's Energy Technologies Institute (ETI) awarded Glosten funding to perform a FEED study for a full-scale 6MW offshore wind floating platform system demonstrator.
Read More
Delta Mariner Designed to Carry Rockets
As Owner's Design Agent, Glosten utilized a unique "Design Lead" process to help deliver the stern-loading Ro-Ro Delta Mariner ahead of schedule and on budget.
Read More
New Requirements for Research Vessels Everywhere
Glosten supported UNOLS in developing a standardized methodology to provide Maximum Capability Documents for every component of every UNOLS vessel.
Read More
PelaStar Tension Leg Platform for Floating Offshore Wind
The PelaStar system was conceived by Glosten engineers in 2006, who saw a need to reduce the capital costs of offshore wind and access sites with superior wind resources.