Projects

Our depth and breadth of experience has resulted in a body of work we’re proud to showcase. From one-of-a-kind projects to solid fundamentals, we’re confident you’ll find that our commitment to excellence shines through in everything that we do. Explore our case studies, and see what Glosten can do for you.

Offshore Wind – Front End Engineering Design Study

, ,

In 2012, the UK's Energy Technologies Institute (ETI) awarded Glosten funding to perform a FEED study for a full-scale 6MW offshore wind floating platform system demonstrator.

Read More

Delta Mariner Designed to Carry Rockets

,

As Owner's Design Agent, Glosten utilized a unique "Design Lead" process to help deliver the stern-loading Ro-Ro Delta Mariner ahead of schedule and on budget.

Read More

PelaStar Tension Leg Platform for Floating Offshore Wind

, , ,

The PelaStar system was conceived by Glosten engineers in 2006, who saw a need to reduce the capital costs of offshore wind and access sites with superior wind resources.

Read More

Port of Portland Dredge Oregon Repower

, ,

The Port of Portland hired Glosten to develop a comprehensive design package for repowering Dredge Oregon. Glosten's repower efforts will reduce the dredge's diesel particulate emissions by nearly 90%.

Read More

Oregon State University Leads Research Vessel Acquisition

, , ,

The National Science Foundation (NSF) selected Oregon State University (OSU) to lead the design and acquisition for the new Regional Class Research Vessels (RCRVs). OSU enlisted Glosten to develop...

Read More

Panama Canal Expansion Consulting

,

The Panama Canal Third Set of Locks will double the Canal’s capacity by creating a new third lane of traffic and allowing more and larger ships to transit.

Read More

Foss Arctic Class Tugs

, ,

Foss Maritime is building three arctic class tugboats at its Rainier Shipyard, to serve the oil and gas industries in Alaska. Foss engaged Glosten to execute this new design...

Read More

JOIDES Resolution Drill Ship Refit

,

Transocean contracted Glosten in 2006 to develop the contract design package for an extensive refit of the JOIDES Resolution.

Read More