
New Life for Dredge Tender Ivanoff
The Port of Portland's Ivanoff was lacking in propulsion and steerage both ahead and astern to meet the Port’s operational needs. In 2015, the Port of Portland commissioned Glosten...
Read More
Ballast Module Retrofit Program
Glosten was tasked with developing a ballast module retrofit design and integration program for a major tank barge operator. Upon determining the most practical integration solution, Glosten provided...
Read More
Bulk Carrier Ballast Water Treatment System Retrofit
The Sheila Ann, a Panamax bulk carrier owned by CSL, was scheduled for drydocking in December of 2014. CSL tasked Glosten with determining the feasibility of retrofitting the...
Read More
Global Class Research Vessel Gets a Mid-Life Overhaul
Glosten is supporting the mid-life overhaul of the 25-year old research vessel of the University of Washington, R/V Thomas G. Thompson.
Read More
New Requirements for Research Vessels Everywhere
Glosten supported UNOLS in developing a standardized methodology to provide Maximum Capability Documents for every component of every UNOLS vessel.
Read More
Port of Portland Dredge Oregon Repower
The Port of Portland hired Glosten to develop a comprehensive design package for repowering Dredge Oregon. Glosten's repower efforts will reduce the dredge's diesel particulate emissions by nearly 90%.
Read More
Cold Ironing Solutions
Ocean-going vessels are often viewed as major contributors to air pollution. Matson tasked Glosten to develop cold ironing solutions for eight of their vessels.
Read More
JOIDES Resolution Drill Ship Refit
Transocean contracted Glosten in 2006 to develop the contract design package for an extensive refit of the JOIDES Resolution.
Read More