
Yeosu Expo Floating Fountain
The International Exposition 2012 Yeosu Korea featured the debut of a one-of-a-kind floating fountain combining displays of water, light, and fire. Glosten was tasked by WET with designing...
Read More
Making Way for a New Bay Bridge
Glosten assisted California Engineering Contractors with the marine aspects of demolishing the SF-Oakland Bay Bridge, reversing the construction process by disassembling the bridge in chunks and lowering the spans...
Read More
Longest Floating Bridges in the World
WSDOT commissioned Glosten in 1983 to evaluate the wind and wave forces for the new I-90 bridge design and the two existing Lake Washington bridges.
Read More
Olmsted Dam to Revitalize Ohio River Commerce
Glosten worked closely with Washington Group / Alberici to design three unique barges to support the "in the wet" construction of the Olmsted Locks and Dam project.
Read More
Coeur d’Alene Resort Floating Golf Green
One of Glosten's most unique projects is its support of Dix Corporation in the design of the renowned floating 14th hole at the Coeur d’Alene Resort.
Read More
PelaStar Tension Leg Platform for Floating Offshore Wind
The PelaStar system was conceived by Glosten engineers in 2006, who saw a need to reduce the capital costs of offshore wind and access sites with superior wind resources.
Read More
Panama Canal Expansion Consulting
The Panama Canal Third Set of Locks will double the Canal’s capacity by creating a new third lane of traffic and allowing more and larger ships to transit.
Read More
Arctic Tow Mission
Glosten was contracted by Exxon Neftegas Limited for overall management of moving the ORLAN, a 325 feet square Concrete Island Drilling Structure (CIDS), from Prudhoe Bay, Alaska, to Sovietskaya...
Read More