
Yeosu Expo Floating Fountain
The International Exposition 2012 Yeosu Korea featured the debut of a one-of-a-kind floating fountain combining displays of water, light, and fire. Glosten was tasked by WET with designing...
Read More
Olmsted Dam to Revitalize Ohio River Commerce
Glosten worked closely with Washington Group / Alberici to design three unique barges to support the "in the wet" construction of the Olmsted Locks and Dam project.
Read More
Offshore Wind – Front End Engineering Design Study
In 2012, the UK's Energy Technologies Institute (ETI) awarded Glosten funding to perform a FEED study for a full-scale 6MW offshore wind floating platform system demonstrator.
Read More
PelaStar Tension Leg Platform for Floating Offshore Wind
The PelaStar system was conceived by Glosten engineers in 2006, who saw a need to reduce the capital costs of offshore wind and access sites with superior wind resources.
Read More
Exxon Kizomba – Traversing Oceans
Spanning 10,000 miles over six months, the Glosten-developed tow plan for the Kizomba A brought the vessel from Korea to offshore Angola via the Cape of Good Hope.
Read More
I-35 Bridge: Responding to Tragedy
On August 1 2007, the I-35 bridge collapsed in the middle of rush hour. Glosten was contracted to design the bridge segment lift sequence and grillage, and the...
Read More
Arctic Tow Mission
Glosten was contracted by Exxon Neftegas Limited for overall management of moving the ORLAN, a 325 feet square Concrete Island Drilling Structure (CIDS), from Prudhoe Bay, Alaska, to Sovietskaya...
Read More
In a League of its Own: the Semi-Submersible SBX-1
Glosten worked as the project engineering integrator and designer for all marine aspects of this $900 million project.
Read More