Yeosu Expo Floating Fountain
The International Exposition 2012 Yeosu Korea featured the debut of a one-of-a-kind floating fountain combining displays of water, light, and fire. Glosten was tasked by WET with designing...
Read More
Ballast Module Retrofit Program
Glosten was tasked with developing a ballast module retrofit design and integration program for a major tank barge operator. Upon determining the most practical integration solution, Glosten provided...
Read More
Bulk Carrier Ballast Water Treatment System Retrofit
The Sheila Ann, a Panamax bulk carrier owned by CSL, was scheduled for drydocking in December of 2014. CSL tasked Glosten with determining the feasibility of retrofitting the...
Read More
Offshore Wind – Front End Engineering Design Study
In 2012, the UK's Energy Technologies Institute (ETI) awarded Glosten funding to perform a FEED study for a full-scale 6MW offshore wind floating platform system demonstrator.
Read More
New Requirements for Research Vessels Everywhere
Glosten supported UNOLS in developing a standardized methodology to provide Maximum Capability Documents for every component of every UNOLS vessel.
Read More
PelaStar Tension Leg Platform for Floating Offshore Wind
The PelaStar system was conceived by Glosten engineers in 2006, who saw a need to reduce the capital costs of offshore wind and access sites with superior wind resources.
Read More
Port of Portland Dredge Oregon Repower
The Port of Portland hired Glosten to develop a comprehensive design package for repowering Dredge Oregon. Glosten's repower efforts will reduce the dredge's diesel particulate emissions by nearly 90%.
Read More
Panama Canal Expansion Consulting
The Panama Canal Third Set of Locks will double the Canal’s capacity by creating a new third lane of traffic and allowing more and larger ships to transit.
Read More