
Yeosu Expo Floating Fountain
The International Exposition 2012 Yeosu Korea featured the debut of a one-of-a-kind floating fountain combining displays of water, light, and fire. Glosten was tasked by WET with designing...
Read More
Longest Floating Bridges in the World
WSDOT commissioned Glosten in 1983 to evaluate the wind and wave forces for the new I-90 bridge design and the two existing Lake Washington bridges.
Read More
Olmsted Dam to Revitalize Ohio River Commerce
Glosten worked closely with Washington Group / Alberici to design three unique barges to support the "in the wet" construction of the Olmsted Locks and Dam project.
Read More
Beloved Research Vessel Approaches Mid-Life Overhaul
Glosten is supporting the mid-life overhaul of the 25-year old research vessel of the University of Washington, R/V Thomas G. Thompson.
Read More
PelaStar Tension Leg Platform for Floating Offshore Wind
The PelaStar system was conceived by Glosten engineers in 2006, who saw a need to reduce the capital costs of offshore wind and access sites with superior wind resources.
Read More
Sikuliaq Readies for Ocean Research in Arctic
Glosten designed the R/V Sikuliaq to accommodate up to 26 scientists and students to conduct a myriad of cross-disciplinary studies in the Alaska region, year-round.
Read More
Foss Arctic Class Tugs
Foss Maritime is building three arctic class tugboats at its Rainier Shipyard, to serve the oil and gas industries in Alaska. Foss engaged Glosten to execute this new design...
Read More
I-35 Bridge: Responding to Tragedy
On August 1 2007, the I-35 bridge collapsed in the middle of rush hour. Glosten was contracted to design the bridge segment lift sequence and grillage, and the...
Read More