Projects

Our depth and breadth of experience has resulted in a body of work we’re proud to showcase. From one-of-a-kind projects to solid fundamentals, we’re confident you’ll find that our commitment to excellence shines through in everything that we do. Explore our case studies, and see what Glosten can do for you.

Olmsted Dam to Revitalize Ohio River Commerce

,

Glosten worked closely with Washington Group / Alberici to design three unique barges to support the "in the wet" construction of the Olmsted Locks and Dam project.

Read More

Offshore Wind – Front End Engineering Design Study

, ,

In 2012, the UK's Energy Technologies Institute (ETI) awarded Glosten funding to perform a FEED study for a full-scale 6MW offshore wind floating platform system demonstrator.

Read More

Delta Mariner Designed to Carry Rockets

,

As Owner's Design Agent, Glosten utilized a unique "Design Lead" process to help deliver the stern-loading Ro-Ro Delta Mariner ahead of schedule and on budget.

Read More

PelaStar Tension Leg Platform for Floating Offshore Wind

, , ,

The PelaStar system was conceived by Glosten engineers in 2006, who saw a need to reduce the capital costs of offshore wind and access sites with superior wind resources.

Read More

A Ship that Flips

,

FLIP is a 355-foot-long, or tall, research platform. Glosten was contracted to assist Scripps in the design, model testing, and construction of this remarkable vessel.

Read More

Oregon State University Leads Research Vessel Acquisition

, , ,

The National Science Foundation (NSF) selected Oregon State University (OSU) to lead the design and acquisition for the new Regional Class Research Vessels (RCRVs). OSU enlisted Glosten to develop...

Read More

Foss Arctic Class Tugs

, ,

Foss Maritime is building three arctic class tugboats at its Rainier Shipyard, to serve the oil and gas industries in Alaska. Foss engaged Glosten to execute this new design...

Read More

Excavator Dredge Design

,

J.E. McAmis, a marine construction firm used to working in tough conditions, needed a hydraulic excavator to add to their dredging capability, enabling accurate digging in firm bottom conditions...

Read More