News

THE SCUTTLEbutt.

DSC_0155
Social
R/V David Packard Construction Kicks Off with Keel Laying Ceremony
December 2, 2021

Construction for the R/V David Packard officially kicked off last Thursday with a keel laying ceremony at Freire Shipyard. Our on-site engineers, William Moon and Isabel Goñi-McAteer joined Michael Kelly of MBARI to celebrate this project milestone.

View Post

MicrosoftTeams-image (88)
Social
Dutra Launches Second Glosten-Designed Split-Hull Hopper Barge
November 3, 2021

Dutra Dredging launched their second Glosten-designed split-hull hopper barge this summer, two years after its predecessor, the ES15. The MS16 and ES15 echo the original design we delivered in 1995 with some important updates, including all-new hydraulics from Price Engineering and compliance with the latest ABS requirements prior to their construction at Corn Island Shipyard and Gunderson.

View Post

2
Press
Calwave Deploys Patented xWave Wave Energy Converter
October 20, 2021

The recent deployment of the CalWave Wave Energy Converter (WEC) marks another exciting project milestone this year. Glosten supported CalWave with the engineering and design alongside collaborators from Scripps, the NREL, Sandia, DNV GL, and UC Berkeley.

View Article

Spanish_vessel_Luz_de_Mar_Sasmar_Astilleros_Armon_built
Press
Defining the Best Technology for Rescue Tugs
October 8, 2021

Check out the September/October 2021 edition of International Tug & Salvage magazine to learn about the merits of purpose-designed rescue tugs and why selecting the right vessel for the job is essential for protecting lives, property, and the local environment.

View Article

MicrosoftTeams-image (10)
Social
Oscilla Power Launches the Triton-C Wave Energy Converter
September 29, 2021

Oscilla Power, Inc has launched their first wave energy system, the Triton-C. This is a major milestone and Glosten is honored to have been a part of it, working with OPI to integrate their design through a FEED cycle and providing the design package for the system’s construction.

View Post

2-0799
Press
Glosten is Meeting the Decarbonization Challenge, by Design
September 15, 2021

Glosten President Morgan Fanberg, PE recently spoke with Greg Trauthwein of Maritime Reporter and Engineering News to discuss some of the projects and initiatives Glosten has launched to help the industry meet future emissions requirements.

View Article

Hydrofoil_T_Boat_Front_Port_View_Olympic_Mountains_Motion
Press
After a Year of Dealing With Covid and Low Ridership, Ferry Operators Are Rebounding
September 9, 2021

Passenger transportation is making a comeback after a year of low ridership, and recent government grants mean progress for projects like the Glosten/Bieker Foil Ferry.

View Article

IMG_4733
Social
Kiewit Launches the SAS 2601 and 2602
September 2, 2021

Kiewit has successfully launch of two new split-hull hopper barges: SAS 2601 and 2602. Glosten provided the design for the sister vessels, which were built at Corn Island Shipyard, and Price Engineering supplied the cylinders, winch, and hydraulic and controls systems.

View Post

Pelastar 12MW Platform
Press
A Windy California Dream
August 24, 2021

Glosten Vice President Ben Ackers sat down with Electrical Contractor Magazine this month to discuss Glosten & GE’s collaborative development of a floating turbine using PelaStar technology and efforts to encourage adoption by making the turbine’s construction and installation more affordable.

View Article

DPP-8031
Social
First Ollis-Class Ferry En Route to Staten Island
August 11, 2021

The first Ollis-class Staten Island Ferry is officially en route to New York City. Glosten supported the construction of the SSG Michael H. Ollis as owner’s representative through contract design, shipyard qualification and selection, bid review and contract negotiations, construction oversight, testing, and trials.

View Post